Saturday, October 25, 2008

Cabling Binge

Well, I've been on a cabling binge where I've knitted up 6 cable projects all for the month of October! Whew! The first for your viewing pleasure is my cabled winter cap using a Cashmere/Wool blend of my own making. Very thick and very warm ~ so let it snow!!!!
This is me modeling the cap.


And I've completed five more squares for my afghan project. This is 10 squares down and 10 to go (YESSSSSSS, I am half-way through!!!!!!).
This one I am calling the "Support our
Troops" square. I don't necessarily support our wars overseas, but we can't abandon our soilders who are fighting on foreign soil. Also, both of my brothers are in the military (one in the Navy, and the other in the Army and in Iraq), so I've knitted this square in their honor. Hey bro's, you rock!

I love this square with the Saxon braid.

This is a really quirky cable designed by a Quebecois.

I call this one the "Interlocking Lockets".

And, finally, the Reversible Square. This pattern is on both sides of this square, thereby making it reversible.






Saturday, October 4, 2008

Trailblazer II unveiled


Well, it took a while, and putting in the work whenever I had a spare moment between two jobs. I just finished the Trailblazer II, modeled after the original Trailblazer I came up with, but using finer yarns and smaller needles. I am very pleased with this pattern ~ simple, masculine and comfortable.

Here's the simple increase along the top of the foot.

This was a toe-up pattern, which worked perfectly.

The balls of the foot and the heel are reinforced to resist wear.

I just had to add the seam along the back of the cuff. So cool and it gives the sock another point of interest.

Two more squares done!

Finished two more squares for the afghan. Here they are!
This is five squares down and 15 more to go! This means I am a quarter of the way in knitting all my squares ~ not bad!